This roadmap is an estimate, not a promise. Early phases may move faster because the project is still small. Later phases depend on hardware access, app store rules, security review, and real users.
The current state is:
- Phase 0 is mostly done. The repo, docs, CI, issues, labels, and release setup exist. Community and public launch items remain.
- Phase 1 engineering is done. One shared
.wasmcomponent proved the base runtime path. - Phase 2 is active and close in engineering terms. Krate now has UAPI slices for CLI-style apps, UCap manifests and launch grants, sample apps, and repeatable evidence scripts. Formal Phase 2 exit still needs final cross-host evidence, UAPI freeze review, and an outside developer walkthrough.
- Phase 3 is about half done. One portable component opens real windows
on all three desktop OSes (native AppKit widgets on macOS; winit windows
with the first drawn-widget pass on Linux and Windows), and the agent
surface (embedding API,
--jsonreports, MCP server) is complete. The original contract-layer note follows: the firstguiworld and theui,gfx, andaudioWIT drafts now parse and have a CI checker. This does not freeze the API and does not replace Phase 2's remaining outside review.
System Timeline
Green means built or proven. Yellow means built enough for the current proof. Gray means planned.
flowchart LR
P0["0. Foundation<br/>repo, docs, CI"]
P1["1. Runtime proof<br/>same WASM on 3 desktops"]
P2["2. UAPI v0.1<br/>files, network, time, locale"]
P3["3. Desktop UI<br/>native windowed app"]
P4["4. Mobile hosts<br/>iOS and Android"]
P5["5. SDK<br/>templates, debug, hot reload"]
P6["6. Distribution<br/>bundles, signing, identity"]
P7["7. v1.0<br/>real product migration"]
P0 --> P1 --> P2 --> P3 --> P4 --> P5 --> P6 --> P7
classDef done fill:#d9fbe3,stroke:#16833a,color:#102a17,stroke-width:2px;
classDef current fill:#fff3bf,stroke:#b7791f,color:#2d2100,stroke-width:2px;
classDef pending fill:#eeeeee,stroke:#999999,color:#777777,stroke-width:1px;
class P0 done;
class P1 done;
class P2 current;
class P3 current;
class P4,P5,P6,P7 pending;
Phase Table
| # | Phase | Goal | Estimate | Status |
|---|---|---|---|---|
| 0 | Foundation | Make the project real enough to work in public. | Done enough for development; external items pending | Mostly done |
| 1 | Runtime proof | Run one WASM component on Linux, macOS, and Windows. | Done | Engineering done |
| 2 | UAPI v0.1 | Build useful CLI APIs and sample apps. | in progress | Active; exit evidence in progress |
| 3 | Desktop UI | Run one GUI app on Windows, macOS, and Linux. | est. 6 to 10 weeks | About half done: real windows on all three OSes, native macOS widgets, first drawn pass, agent surface complete |
| 4 | Mobile hosts | Run the same app on iOS and Android. | est. 8 to 12 weeks | Planned |
| 5 | Developer SDK | Make project creation, debug, and packaging smooth. | est. 6 to 10 weeks | Planned |
| 6 | Distribution | Add bundles, signing, updates, and identity. | est. 8 to 12 weeks | Planned |
| 7 | v1.0 hardening | Migrate a real app and clean up for public launch. | est. after Phase 6 | Planned |
What Must Happen Before Phase 2 Exits
The code has moved well past Phase 1. Phase 2 should not be called closed until the evidence is crisp:
- Freeze UAPI v0.1 after final review.
- Collect clean Linux, macOS, and Windows evidence for the sample apps and UCap denial paths.
- Keep benchmark, dependency, and fuzz evidence current for the final commit.
- Complete one timed outside developer walkthrough.
- Finalize the Phase 2 retrospective.
- Keep Phase 3 implementation limited to draft contracts and prototypes until the Phase 2 outside review is complete.
Phase 2 In One Sentence
Phase 2 makes Krate useful: a WebAssembly app can call Krate for files, network, time, locale, and terminal I/O, and the runtime can enforce explicit capability grants before host access.
Full planning details live in the Plan/ directory.